PEB Fabrication & Manufacturing Plant
Shot Blasting Chamber & Accessories
Surface preparation to SA 2.5 standards for superior paint bonding
Back to Plant & Machinery
Request Deployment Estimate
Equipment Overview
Before paint is applied, steel must be cleaned of mill scale and rust. Our shot blasting chamber prepares structural steel components to SA 2.5 cleanliness, ensuring high paint bonding and anti-corrosion life.
Key Advantages & Capabilities
- Dynamic dust collection and filtration system for clean shop air
- Prepares steel for heavy marine-grade epoxy coatings
- Extends building corrosion lifespan by up to 300% compared to hand-brushing
TECHNICAL SPECS
Specification Details
Total Count / License01 Setup
Chamber CapacityAccommodates structural columns up to 12m length
Abrasive MediaHardened steel shots and steel grit blend
Cleanliness StandardISO 8501-1 SA 2.5 (Near White Metal Blasting)
Surface Profile Height40 to 75 microns anchor pattern profile
